All project work products are physically stored in the project repository, and logically organized in accordance with
the product directory structure. The deployment unit contains all the deliverable items, and these are listed in
the Bill of Materials.
In this task, the Configuration Manager creates a copy of the deliverable items, baselined and under version control in
the project repository, onto the necessary media for deployment in the target environment. The necessary media
could be a CD-ROM, or in the case of a web-downloadable product, a zipped copy available for download.
|